Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'HOOD RD 110.944 ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-407 ' (1) ·
'SR-528 ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91SB ON/OFF 76.4' (1)
700084 (1) ·
700090 (1) ·
700150 (1) ·
880058 (1) ·
880066 (1) ·
890066 (1) ·
930381 (1) ·
930419 (1) ·
930441 (1) ·
930450 (1) ·
940053 (1) ·
940057 (1) ·
940058 (1) ·
940073 (1) ·
940083 (1)
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB-St Johns River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.