Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Owner 022: 31 & Scour 113: Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022: (Click arrow to add another value)
Lanes 028a:
2 (1) · 4 (1) · 5 (1) · 6 (1)
Traffic Year 030:
Service On 042a:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 38 results in range #1 to #38.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)