Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'CANAL L-20 ' (1) ·
'FL TPK SR-91 ' (1) ·
'FL. TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'Turnpike (SR-91) ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'45th Street CR-702' (1) ·
'6TH AVE SO. EB ' (1) ·
'6TH AVE SO. WB ' (1) ·
'CR-714 Indian St. ' (1) ·
'Hypoluxo Rd ' (1) ·
'MINUTE MAID RD 165' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
894062 (1) ·
931004 (1) ·
934166 (1) ·
934302 (1) ·
934307 (1) ·
934367 (1) ·
934907 (1) ·
934908 (1) ·
934909 (1) ·
934925 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
940057 (1) ·
940058 (1) ·
940059 (1) ·
940060 (1) ·
940073 (1) ·
940083 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.