Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Location 009 :
'0.5Mi West of Kepler Rd. ' or
'AT 74TH AVE. ' or
'AT CR-615 - 66TH AVE '
Use the filters below to narrow your results.
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)