Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Length 049: 53 & Scour 113 : Bridge not over waterway. or Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event.

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
10 (1) · 2 (1) · 3 (1) · 4 (1) · 6 (1)
Traffic Year 030:
Service Under 042b:
Length 049: (Click arrow to add another value)
Width 052:
Superstructure 059:
Substructure 060:
Channel 061:
Culvert 062:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 11 results in range #1 to #11.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)