Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700122 (1) ·
700941 (1) ·
790018 (1) ·
790920 (1) ·
890015 (1) ·
894014 (1) ·
930291 (1) ·
930292 (1) ·
930805 (1) ·
934142 (1) ·
934499 (1) ·
934731 (1) ·
940041 (1) ·
940071 (1)
'0.4MI NE OF A1A ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 14 results in range #1 to #14.