Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884082 (1) ·
885601 (1) ·
885602 (1) ·
885605 (1) ·
885813 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934344 (1) ·
934960 (1) ·
936550 (1) ·
940043 (1) ·
944008 (1) ·
945254 (1) ·
945260 (1)
'0.3 Miles North of SR 60 ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI Nof PT ST LUCIE BLD' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'56th Place North ' (1) ·
'6.3MI S of SoBay at US-27' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)