Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934913 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
937702 (1) ·
937704 (1) ·
937708 (1) ·
945261 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)