Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DITCH NO. 46 ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Sebastian Canal ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'Tillman Canal ' (1)
'101ST STREET ' (1) ·
'4TH STREET ' (1) ·
'53RD STREET ' (1) ·
'74TH AVE. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'90TH AVE ' (1) ·
'Aviation Ave. ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-512 ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'HOLLY DRIVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Maytown Road ' (1) ·
'Micco Rd. ' (1)
704035 (1) ·
705908 (1) ·
794139 (1) ·
880041 (1) ·
880062 (1) ·
880063 (1) ·
884016 (1) ·
884019 (1) ·
884022 (1) ·
884023 (1) ·
884024 (1) ·
884036 (1) ·
884063 (1) ·
937001 (1) ·
937002 (1)
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1 MI N OF SR-60 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'2 mi West of US-1 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)