Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880018 (1) ·
880019 (1) ·
880040 (1) ·
880044 (1) ·
880049 (1) ·
884015 (1) ·
884047 (1) ·
894000 (1) ·
937201 (1) ·
940020 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'0.8MI E OF 58TH AVE. ' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'1Mi W of US-1 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)