Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790194 (1) ·
794162 (1) ·
894063 (1) ·
894064 (1) ·
934345 (1) ·
934346 (1) ·
934360 (1) ·
934361 (1) ·
934366 (1) ·
934517 (1) ·
934552 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'Indian Riverside Park ' (1) ·
'SR-40 WB - Habitat Connec' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 12 results in range #1 to #12.