Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790042 (1) ·
790100 (1) ·
930379 (1) ·
930384 (1) ·
930390 (1) ·
930392 (1) ·
930545 (1) ·
934201 (1) ·
940049 (1) ·
940082 (1)
'0.3MI N of SR-706 ' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'500FT WEST OF I-95 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'SR-A1A East of ICWW ' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 10 results in range #1 to #10.