Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-54 Canal ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'Intracoastal Waterway ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'St. Sebastian River ' (1) ·
'US-92 ' (1)
'EB 706 To SB I-95 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'WB SR706 to SB I95' (1)
700237 (1) ·
700238 (1) ·
790042 (1) ·
790071 (1) ·
790100 (1) ·
884078 (1) ·
884079 (1) ·
930159 (1) ·
930370 (1) ·
930384 (1) ·
930390 (1) ·
940076 (1) ·
940111 (1) ·
940112 (1) ·
940951 (1)
'0.37MI N OF SR-712 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'I-95 over Midway Road ' (1) ·
'I-95 SB over US-92 ' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.