Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700066 (1) ·
700138 (1) ·
700158 (1) ·
790055 (1) ·
790066 (1) ·
790248 (1) ·
894060 (1) ·
930289 (1) ·
930298 (1) ·
930374 (1) ·
930488 (1) ·
930489 (1) ·
930529 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'4.5 Mi. N of SR-46 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'I-4 Connector over US-92 ' (1) ·
'Just West of I 95 ' (1) ·
'North of P. Beach Airport' (1) ·
'SR-472 over US-17/92 ' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
1.3 Mi. East of CR-507 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.