Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700075 (1) ·
700141 (1) ·
700185 (1) ·
700190 (1) ·
790058 (1) ·
790059 (1) ·
790084 (1) ·
930428 (1) ·
930446 (1) ·
930470 (1) ·
930472 (1) ·
934282 (1) ·
940055 (1)
'0.5 MILE WEST OF JOG RD ' (1) ·
'1.16 MI S OF SR-68 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'Just west of I-95 ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'Port of Palm Beach ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1) ·
SR-507 SB-Tillman Canal (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)