Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Gatlin Blvd ' (1) ·
'I-95 ' (1) ·
'Maytown Rd. ' (1) ·
'Maytown Road ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'SR-404 ' (1) ·
'St Johns River ' (1) ·
'St. Johns River ' (1) ·
'Tillman Canal ' (1) ·
'WPB Canal (C-51) ' (1) ·
Tillman Canal (1)
'BELVEDERE ROAD ' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'PICOS RD 154.90 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-50 EB ' (1) ·
'SR-50 WB ' (1) ·
'SR-507 NB ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
SR-507 SB (1)
700013 (1) ·
700075 (1) ·
700107 (1) ·
700141 (1) ·
700185 (1) ·
700190 (1) ·
700200 (1) ·
700217 (1) ·
790058 (1) ·
790059 (1) ·
790084 (1) ·
930386 (1) ·
930387 (1) ·
930428 (1) ·
930446 (1) ·
930472 (1) ·
934282 (1) ·
940055 (1) ·
940108 (1) ·
940109 (1)
'0.3 mile South of SR 706 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'1.16 MI S OF SR-68 ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'Just west of I-95 ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-50 EB -St Johns River ' (1) ·
'SR-50 WB -St Johns River ' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-520 WB -St Johns River' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1) ·
SR-507 SB-Tillman Canal (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.