Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Congress Avenue ' (1) ·
'CR 76A ' (1) ·
'CR-880 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'EB 706 To SB I-95 ' (1) ·
'EB PGA Blvd. ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR-405 EB ' (1) ·
'SR-407 NB ' (1) ·
'SR-472 EB ' (1) ·
'Tomoka Farms Rd. ' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR706 to SB I95' (1)
700085 (1) ·
700102 (1) ·
700116 (1) ·
700156 (1) ·
790042 (1) ·
790053 (1) ·
790100 (1) ·
790105 (1) ·
890114 (1) ·
890121 (1) ·
930106 (1) ·
930349 (1) ·
930381 (1) ·
930384 (1) ·
930390 (1) ·
930419 (1) ·
930528 (1) ·
930940 (1)
'0.1MI W of US-98 / SR-441' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Between SR704 and 12th St' (1) ·
'CR 76A over I-95 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'I-95 SB - CR-5A ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
I-95 NB and CR-5A (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.