Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Congress Avenue ' (1) ·
'CR-880 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'SR-405 EB ' (1) ·
'SR-407 NB ' (1) ·
'SR-472 EB ' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'Tomoka Farms Rd. ' (1) ·
'WB SR706 to SB I95' (1)
700085 (1) ·
700102 (1) ·
700116 (1) ·
700156 (1) ·
790042 (1) ·
790053 (1) ·
790100 (1) ·
790105 (1) ·
790106 (1) ·
890083 (1) ·
930381 (1) ·
930384 (1) ·
930390 (1) ·
930419 (1) ·
930528 (1) ·
930940 (1)
'0.1MI W of US-98 / SR-441' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'I-95 SB - CR-5A ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
I-95 NB and CR-5A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.