Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SB I 95 to Cong Av' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'WB SR706 to SB I95' (1)
700052 (1) ·
700074 (1) ·
700127 (1) ·
700140 (1) ·
790042 (1) ·
790100 (1) ·
790190 (1) ·
930378 (1) ·
930384 (1) ·
930390 (1) ·
930444 (1) ·
945272 (1) ·
949901 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.85 mile South of Linton' (1) ·
'5.7MI W OF US-1 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 WB - SR-401 ' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.