Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700066 (1) ·
700138 (1) ·
700192 (1) ·
700213 (1) ·
700231 (1) ·
700232 (1) ·
790066 (1) ·
880102 (1) ·
930298 (1) ·
930417 (1) ·
930418 (1) ·
930487 (1) ·
930516 (1)
'1 mile North of SR 80 ' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'4.5 Mi. N of SR-46 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'I-95 over SR-60 ' (1) ·
'Over Fellsmere Canal ' (1) ·
'SR-704 Over SR-91 ' (1) ·
Over Fellsmere Canal (1) ·
SR-520 - Banana River (1) ·
US-192 EB-St Johns Relief (1)
114500 (1) ·
160500 (1) ·
16340 (1) ·
21382 (1) ·
26500 (1) ·
32750 (1) ·
43500 (1) ·
4400 (1) ·
6400 (1) ·
7500 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
13012 (1) ·
15000 (1) ·
198658 (1) ·
278468 (1) ·
28350 (1) ·
37098 (1) ·
45978 (1) ·
56821 (1) ·
75473 (1) ·
7634 (1)
Showing below up to 13 results in range #1 to #13.