Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-15 Canal ' (1) ·
'C-52 Canal ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'I-95 ' (1) ·
'LEVEE NO.8 ' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 (Fl. Tpk.) ' (1)
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Pineda Causeway ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR A1A ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1)
700225 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890128 (1) ·
890129 (1) ·
890159 (1) ·
930184 (1) ·
930265 (1) ·
930371 (1) ·
930372 (1) ·
930407 (1) ·
930445 (1) ·
930486 (1) ·
930530 (1) ·
930531 (1) ·
940085 (1)
'1 mile North of SR 704 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'I 95 SR706 interchange ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
101000 (1) ·
106500 (1) ·
114500 (1) ·
13800 (1) ·
24000 (1) ·
26000 (1) ·
38000 (1) ·
40250 (1) ·
4800 (1) ·
5850 (1) ·
6174 (1) ·
8500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10150 (1) ·
10712 (1) ·
14748 (1) ·
175235 (1) ·
184778 (1) ·
198658 (1) ·
23943 (1) ·
41640 (1) ·
45110 (1) ·
65930 (1) ·
69834 (1) ·
8328 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)