Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-23 CANAL ' (1) ·
'C-52 Canal ' (1) ·
'Cypress Creek ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'HOWARD CREEK ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'LEVEE NO.8 ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'St Johns River ' (1) ·
'Sykes Creek ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'Becker Rd. ' (1) ·
'I 95 SR 9 ' (1) ·
'JOG ROAD ' (1) ·
'MURPHY RD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'Sea Ray Drive ' (1) ·
'SR-528 ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-80WB (Southern)' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 178.03' (1) ·
'WESTMORELAND BLVD ' (1)
700084 (1) ·
700150 (1) ·
704144 (1) ·
880050 (1) ·
880052 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890115 (1) ·
890116 (1) ·
890159 (1) ·
894003 (1) ·
930265 (1) ·
930373 (1) ·
930375 (1) ·
930407 (1) ·
930486 (1) ·
930519 (1) ·
934297 (1) ·
941001 (1) ·
945250 (1)
'.75 miles South of SR-882' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'At Exit 76 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
26383999 (1) ·
26410722 (1) ·
26412597 (1) ·
26420393 (1) ·
26465960 (1) ·
26502106 (1) ·
26571634 (1) ·
26581961 (1) ·
26582109 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27120310 (1) ·
27123412 (1) ·
27153115 (1) ·
27333350 (1) ·
27333415 (1) ·
27382573 (1) ·
27382633 (1) ·
27451178 (1) ·
27452951 (1) ·
28242068 (1) ·
28270988 (1) ·
28271054 (1)
80032221 (1) ·
80035976 (1) ·
80055680 (1) ·
80070222 (1) ·
80070240 (1) ·
80074689 (1) ·
80085094 (1) ·
80095468 (1) ·
80103697 (1) ·
80104046 (1) ·
80172570 (1) ·
80174285 (1) ·
80181600 (1) ·
80200100 (1) ·
80214953 (1) ·
80251396 (1) ·
80254429 (1) ·
80403783 (1) ·
80403784 (1) ·
80413919 (1) ·
80434234 (1) ·
80434242 (1) ·
80534962 (1) ·
80534993 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)