Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FECRR ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'LAKE WORTH ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'SR-9 (I-95) ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'Taylor Creek(C-25 Canal)' (1)
'6 Ave S to NB I-95' (1) ·
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'Crosstown Parkway ' (1) ·
'Graham Road ' (1) ·
'I 95 SR 9 ' (1) ·
'ISLAND ROAD ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR519NB(Fiske Blv)' (1) ·
'SR91 NB TPK 116.3 ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700126 (1) ·
700149 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930511 (1) ·
930520 (1) ·
931006 (1) ·
931012 (1) ·
934164 (1) ·
934470 (1) ·
936802 (1) ·
940009 (1) ·
940056 (1) ·
940100 (1) ·
940161 (1)
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-80 & Military Trail ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)