Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Canal C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FECRR ' (1) ·
'I-95 ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Ten Mile Creek ' (1) ·
'Tomoka River ' (1)
'Becker Road ' (1) ·
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'Hanley Rd. S 25th ' (1) ·
'I 95 SR 9 ' (1) ·
'LPGA Blvd ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-91 TPK NS 81.77' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
700197 (1) ·
700198 (1) ·
794038 (1) ·
930287 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1) ·
940056 (1) ·
940160 (1) ·
944016 (1)
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.7 mile North of SR 804 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'SR-80 & Military Trail ' (1)
104500 (1) ·
116000 (1) ·
15900 (1) ·
1800 (1) ·
19000 (1) ·
21000 (1) ·
213000 (1) ·
25000 (1) ·
2544 (1) ·
43000 (1) ·
4959 (1) ·
7100 (1) ·
7400 (1) ·
98900 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
12318 (1) ·
12839 (1) ·
171592 (1) ·
181308 (1) ·
201260 (1) ·
27587 (1) ·
3123 (1) ·
32965 (1) ·
36435 (1) ·
369555 (1) ·
43375 (1) ·
4414 (1) ·
6001 (1) ·
74605 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)