Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FECRR ' (1) ·
'I-95 ' (1) ·
'Indian River EastRelief ' (1) ·
'L-5 Canal ' (1) ·
'Lake Worth Creek Canal ' (1) ·
'S. R. 714 ' (1) ·
'S.R. 714 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Tomoka River ' (1)
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Levee Road ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 5 (US-1) ' (1) ·
'Old Dixie Hwy. ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB SR 5 (US-1) ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'US-192 ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
700235 (1) ·
790022 (1) ·
790107 (1) ·
794016 (1) ·
890108 (1) ·
890109 (1) ·
930460 (1) ·
930473 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
930541 (1) ·
930542 (1) ·
930543 (1) ·
930544 (1) ·
930803 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1) ·
940056 (1)
'.25 mi N of SR 706 ' (1) ·
'.3 mi N of SR 706 ' (1) ·
'0.25 N of SR 706 ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'03 mi N of SR 706 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'At Exit 74 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'NB I-95 / SR 714 ' (1) ·
'SB I-95 / SR-714 ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-80 & Military Trail ' (1) ·
'US-192 - Indian River Rel' (1)
26200070 (1) ·
26252844 (1) ·
26262220 (1) ·
26271349 (1) ·
26403435 (1) ·
26403700 (1) ·
26453240 (1) ·
26475062 (1) ·
26561490 (1) ·
26561515 (1) ·
26563116 (1) ·
26563147 (1) ·
27094089 (1) ·
27094306 (1) ·
27265121 (1) ·
28051925 (1) ·
28124563 (1) ·
28124610 (1) ·
28313962 (1) ·
28314033 (1) ·
29091900 (1) ·
29091985 (1) ·
29203187 (1)
80045783 (1) ·
80045820 (1) ·
80050309 (1) ·
80050346 (1) ·
80052000 (1) ·
80052100 (1) ·
80052450 (1) ·
80052810 (1) ·
80053227 (1) ·
8005960 (1) ·
80064300 (1) ·
80102834 (1) ·
80232097 (1) ·
80232775 (1) ·
80253838 (1) ·
80343718 (1) ·
80362348 (1) ·
80362349 (1) ·
80380610 (1) ·
80472690 (1) ·
80472715 (1) ·
81043203 (1) ·
81043246 (1) ·
81051074 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)