Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700002 (1) ·
700083 (1) ·
700085 (1) ·
700102 (1) ·
700103 (1) ·
700116 (1) ·
700149 (1) ·
700156 (1) ·
790053 (1) ·
790105 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
930528 (1)
'1.5 miles South of SR 806' (1) ·
'At Exit 74 ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-95 SB - CR-5A ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-80 & Military Trail ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
I-95 NB and CR-5A (1)
104500 (1) ·
14500 (1) ·
16340 (1) ·
19300 (1) ·
21000 (1) ·
213000 (1) ·
43000 (1) ·
6800 (1) ·
7000 (1) ·
7100 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
11798 (1) ·
12145 (1) ·
12318 (1) ·
181308 (1) ·
25158 (1) ·
28350 (1) ·
33486 (1) ·
36435 (1) ·
369555 (1) ·
74605 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)