Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CANAL C-24 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FECRR ' (1) ·
'I-4 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-401 ' (1) ·
'SR-513 ' (1) ·
'SR-520 ' (1) ·
'SR-710 ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'U.S.-1 (SR-5) ' (1)
700002 (1) ·
700052 (1) ·
700074 (1) ·
700083 (1) ·
700103 (1) ·
700127 (1) ·
700140 (1) ·
700149 (1) ·
790190 (1) ·
930444 (1) ·
930460 (1) ·
930470 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1) ·
940056 (1) ·
945272 (1) ·
949901 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.85 mile South of Linton' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'5.7MI W OF US-1 ' (1) ·
'At Exit 74 ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'Port of Palm Beach ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 WB - SR-401 ' (1) ·
'SR-80 & Military Trail ' (1)
80031952 (1) ·
80052000 (1) ·
80052100 (1) ·
80052450 (1) ·
80052570 (1) ·
80052810 (1) ·
80053227 (1) ·
80064300 (1) ·
80102834 (1) ·
80221826 (1) ·
80222755 (1) ·
80222756 (1) ·
80253838 (1) ·
80362348 (1) ·
80362349 (1) ·
80375564 (1) ·
80375566 (1) ·
80472690 (1) ·
80472715 (1) ·
80474023 (1) ·
80474142 (1) ·
81152767 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)