Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700054 (1) ·
700128 (1) ·
700145 (1) ·
700188 (1) ·
700210 (1) ·
700211 (1) ·
790211 (1) ·
880103 (1) ·
880104 (1) ·
890126 (1) ·
940058 (1) ·
940083 (1)
'.25mi W OF I-95 ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'CR-516 over I-95 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)