Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Babcock Street ' (1) ·
'EB SR808 Glades Rd' (1) ·
'Fay Blvd. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Port St. Lucie Bld' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-404 EB ' (1) ·
'SR-407 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'WB SR808 Glades Rd' (1) ·
SR-A1A SB (1)
700091 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
704154 (1) ·
704161 (1) ·
790082 (1) ·
790083 (1) ·
790166 (1) ·
790167 (1) ·
880100 (1) ·
890126 (1) ·
930245 (1) ·
930246 (1) ·
940142 (1)
'.05 mi N of Indian Rvr Co' (1) ·
'.25mi W OF I-95 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'800 ft West of I 95 ' (1) ·
'Fay Blvd. - I-95 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.