Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Congress Avenue ' (1) ·
'CR-880 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'SR-404 EB ' (1) ·
'SR-405 EB ' (1) ·
'SR-407 NB ' (1) ·
'SR-472 EB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'Tomoka Farms Rd. ' (1) ·
SR-A1A SB (1)
700054 (1) ·
700085 (1) ·
700102 (1) ·
700116 (1) ·
700128 (1) ·
700145 (1) ·
700156 (1) ·
700210 (1) ·
700211 (1) ·
790053 (1) ·
790105 (1) ·
890126 (1) ·
930381 (1) ·
930419 (1) ·
930528 (1) ·
930940 (1)
'.25mi W OF I-95 ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
I-95 NB and CR-5A (1) ·
SR-A1A SB- George King (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)