Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'CR-3 ' (1) ·
'Cypress Creek ' (1) ·
'George King Blvd ' (1) ·
'HOWARD CREEK ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'Sykes Creek ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
George King Blvd (1)
'I 95 SR 9 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'MURPHY RD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'Sea Ray Drive ' (1) ·
'SR-404 EB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-A1A NB ' (1) ·
'SR510 Wabasso Road' (1) ·
'WESTMORELAND BLVD ' (1) ·
SR-A1A SB (1)
700054 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
704144 (1) ·
880050 (1) ·
880052 (1) ·
890115 (1) ·
890116 (1) ·
890126 (1) ·
894003 (1) ·
930299 (1) ·
930373 (1) ·
930375 (1) ·
930519 (1) ·
945250 (1)
'.25mi W OF I-95 ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'2.5 miles North of SR-706' (1) ·
'At Exit 76 ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)