Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'CR-3 ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'George King Blvd ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LEVEE NO.8 ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'Turnpike (SR-91) ' (1) ·
George King Blvd (1)
'45th Street CR-702' (1) ·
'Becker Rd. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'JOG ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-404 EB ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-80WB (Southern)' (1) ·
'SR-A1A NB ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 178.03' (1) ·
SR-A1A SB (1)
700054 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890126 (1) ·
890159 (1) ·
930265 (1) ·
930407 (1) ·
930486 (1) ·
934166 (1) ·
934297 (1) ·
934908 (1) ·
941001 (1)
'.25mi W OF I-95 ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)