Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Berrys Canal ' (1) ·
'C-51 Canal ' (1) ·
'CR-3 ' (1) ·
'Deep Creek ' (1) ·
'Eau Gallie River ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'SR 91 TPK ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1)
'CR708 125.4 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'Haverhill Rd ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR519SB(Fiske Blv)' (1) ·
'SW 18th Street ' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-17 ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1) ·
'WB US 98 SR 80 ' (1)
700008 (1) ·
700079 (1) ·
700176 (1) ·
790002 (1) ·
790021 (1) ·
790086 (1) ·
790097 (1) ·
790149 (1) ·
790217 (1) ·
890119 (1) ·
930026 (1) ·
930197 (1) ·
930461 (1) ·
930462 (1) ·
930480 (1) ·
930524 (1) ·
930526 (1) ·
930539 (1) ·
934295 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.25 mi. N of County Line' (1) ·
'0.3MI E OF US-1 ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-519 SB I-95 ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'US-17 over Deep Creek ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)