Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Avenue ' (1) ·
'Berrys Canal ' (1) ·
'C-51 Canal ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-3 ' (1) ·
'CR-712 Midway Road ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'Deep Creek ' (1) ·
'SR 91 TPK ' (1) ·
'St. Sebastian River ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1) ·
'US-92 ' (1)
'CR708 125.4 ' (1) ·
'Haverhill Rd ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-17 ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1)
700079 (1) ·
790002 (1) ·
790021 (1) ·
790071 (1) ·
790086 (1) ·
790097 (1) ·
790149 (1) ·
790217 (1) ·
884078 (1) ·
884079 (1) ·
890119 (1) ·
930479 (1) ·
934295 (1) ·
940076 (1) ·
940111 (1) ·
940112 (1) ·
940951 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'I-95 over Midway Road ' (1) ·
'I-95 SB over US-92 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-17 over Deep Creek ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)