Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Palmetto Park Road ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR-421 ' (1)
'COUNTY LINE RD ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-95 NB ' (1) ·
'JOG ROAD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SAVONA BLVD. ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-76 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 SB TPK 157.9 ' (1)
790229 (1) ·
880105 (1) ·
890079 (1) ·
890127 (1) ·
894021 (1) ·
930188 (1) ·
930199 (1) ·
930241 (1) ·
934116 (1) ·
934273 (1) ·
934911 (1) ·
940057 (1) ·
940073 (1) ·
945256 (1)
'.25 mi East of I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'Boca Raton ' (1) ·
'I-95 NB over SR-421 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)