Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CR-3 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'FL TPK SR-91 ' (1) ·
'George King Blvd ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'US-92 ' (1) ·
George King Blvd (1)
'COUNTY LINE RD ' (1) ·
'EB SR 786 ' (1) ·
'Hypoluxo Rd ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'JOG ROAD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SAVONA BLVD. ' (1) ·
'SR-404 EB ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
SR-A1A SB (1)
700054 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
790072 (1) ·
890079 (1) ·
890126 (1) ·
890127 (1) ·
894021 (1) ·
930241 (1) ·
930491 (1) ·
934116 (1) ·
934273 (1) ·
934367 (1) ·
934911 (1) ·
945256 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1st overpass east of I-95' (1) ·
'2.5Mi W of US-1 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)