Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'CR-3 ' (1) ·
'FECRR ' (1) ·
'George King Blvd ' (1) ·
'Indian River East Relief' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
George King Blvd (1) ·
Wickham Road (1)
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR-404 EB ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 NB ' (1) ·
I-95 (1) ·
SR-A1A SB (1)
700054 (1) ·
700059 (1) ·
700128 (1) ·
700134 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
700222 (1) ·
700230 (1) ·
790087 (1) ·
890117 (1) ·
890118 (1) ·
890126 (1) ·
890146 (1) ·
930450 (1) ·
940018 (1) ·
940026 (1)
'.25mi W OF I-95 ' (1) ·
'.75mi E. of Indian R Dr. ' (1) ·
'3MI S of SR-70 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-1 NB - FECRR ' (1) ·
I-95 over Wickham Road (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)