Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'C-24 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Elbow Creek ' (1) ·
'FECRR ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lantana Road ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
Wickham Road (1)
'COUNTY LINE RD ' (1) ·
'EB SR 704 ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'JOG ROAD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'RANGE LINERD CR609' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR-76 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR706 to SB 95 ' (1) ·
I-95 (1)
700007 (1) ·
700059 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
790087 (1) ·
890079 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
894021 (1) ·
930183 (1) ·
930210 (1) ·
930241 (1) ·
930275 (1) ·
930385 (1) ·
930450 (1) ·
934116 (1) ·
934273 (1) ·
934911 (1) ·
940018 (1) ·
940026 (1) ·
945256 (1)
'.25 mi East of I-95 ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'2.5Mi W of US-1 ' (1) ·
'3MI S of SR-70 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 over Elbow Creek ' (1) ·
I-95 over Wickham Road (1)
26222805 (1) ·
26252148 (1) ·
26351625 (1) ·
26404140 (1) ·
26422136 (1) ·
26422223 (1) ·
26485165 (1) ·
26561248 (1) ·
26571548 (1) ·
26581931 (1) ·
26590684 (1) ·
27023771 (1) ·
27023967 (1) ·
27064891 (1) ·
27122264 (1) ·
27161021 (1) ·
27201709 (1) ·
28070512 (1) ·
28134900 (1) ·
28365858 (1) ·
28365910 (1) ·
28395825 (1) ·
28493662 (1)
80041025 (1) ·
80042484 (1) ·
80043087 (1) ·
80043390 (1) ·
80043488 (1) ·
80065384 (1) ·
80084271 (1) ·
80090063 (1) ·
80095581 (1) ·
80101517 (1) ·
80104223 (1) ·
80140214 (1) ·
80140445 (1) ·
80152053 (1) ·
80231068 (1) ·
80282441 (1) ·
80285306 (1) ·
80374336 (1) ·
80430700 (1) ·
80510378 (1) ·
80510486 (1) ·
80511328 (1) ·
80521049 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)