Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'East Island Access' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR-528 EB ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
'WB Spanish River ' (1) ·
I-95 (1)
700059 (1) ·
700109 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
790087 (1) ·
890117 (1) ·
890118 (1) ·
890149 (1) ·
930154 (1) ·
930226 (1) ·
930450 (1) ·
930470 (1) ·
940018 (1) ·
940026 (1)
'3MI S of SR-70 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'Port of Palm Beach ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'US-1 NB - FECRR ' (1) ·
'WB SR800.2Mi west of US-1' (1) ·
I-95 over Wickham Road (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)