Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 CANAL ' (1) ·
'City St. & Crane Creek ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'FECRR ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I-95 ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
Wickham Road (1)
'I-4 Ramp ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
I-95 (1)
700006 (1) ·
700059 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
790023 (1) ·
790087 (1) ·
890117 (1) ·
890118 (1) ·
930450 (1) ·
930457 (1) ·
930459 (1) ·
930494 (1) ·
930527 (1) ·
940018 (1) ·
940026 (1)
'2 miles west of Turnpike ' (1) ·
'3MI S of SR-70 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'I-4 EB Ramp - I-95 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 NB - FECRR ' (1) ·
I-95 over Wickham Road (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
10930 (1) ·
117980 (1) ·
122864 (1) ·
130993 (1) ·
137065 (1) ·
1375 (1) ·
22989 (1) ·
29495 (1) ·
3123 (1) ·
33399 (1) ·
3991 (1) ·
62460 (1) ·
70268 (1)
Showing below up to 16 results in range #1 to #16.