Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-51 Canal ' (1) ·
'I-95 ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'SR 70 ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-192 ' (1)
'Benoist Farms Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'Pineda Causeway ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'TEQUESTA DRIVE ' (1)
700209 (1) ·
700225 (1) ·
890128 (1) ·
890129 (1) ·
930294 (1) ·
930371 (1) ·
930372 (1) ·
930445 (1) ·
930530 (1) ·
930531 (1) ·
931011 (1) ·
934711 (1) ·
936776 (1) ·
940135 (1)
'1 mile North of SR 704 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / SR 882 ' (1) ·
'I-95 over US-192 ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR-710 TPK Interchange ' (1)
10000 (1) ·
101000 (1) ·
106500 (1) ·
11700 (1) ·
13600 (1) ·
13800 (1) ·
20150 (1) ·
226000 (1) ·
38000 (1) ·
40250 (1) ·
68500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
118848 (1) ·
15000 (1) ·
175235 (1) ·
184778 (1) ·
20300 (1) ·
23596 (1) ·
23943 (1) ·
34960 (1) ·
392110 (1) ·
65930 (1) ·
69834 (1)
Showing below up to 14 results in range #1 to #14.