Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700023 (1) ·
700058 (1) ·
700089 (1) ·
700132 (1) ·
700153 (1) ·
930142 (1) ·
930359 (1) ·
930476 (1) ·
930533 (1) ·
935218 (1) ·
940126 (1) ·
940127 (1) ·
944011 (1)
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 13 results in range #1 to #13.