Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-23 CANAL ' (1) ·
'CANAL-17 ' (1) ·
'Cypress Creek ' (1) ·
'Fellsmere Canal ' (1) ·
'HOWARD CREEK ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'Northlake Blvd. ' (1) ·
'SR 60 ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-91 Turnpike ' (1) ·
'Sykes Creek ' (1) ·
'Turnbull Creek ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
Banana River Relief (1) ·
Fellsmere Canal (1) ·
St Johns River Relief (1)
'EB Okee. Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 NB ' (1) ·
'MURPHY RD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Sea Ray Drive ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 SB TPK 100.15' (1) ·
'Turnbull Bay Road ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1) ·
'WB Okee. Blvd. ' (1) ·
'WESTMORELAND BLVD ' (1) ·
I-95 SB (1) ·
SR-520 (1) ·
US-192 EB (1)
700192 (1) ·
700213 (1) ·
700231 (1) ·
700232 (1) ·
704097 (1) ·
704098 (1) ·
704144 (1) ·
794022 (1) ·
880050 (1) ·
880052 (1) ·
880102 (1) ·
890115 (1) ·
890116 (1) ·
894003 (1) ·
930142 (1) ·
930359 (1) ·
930373 (1) ·
930375 (1) ·
930417 (1) ·
930418 (1) ·
930487 (1) ·
930516 (1) ·
930519 (1) ·
945250 (1)
'.75 miles South of SR-882' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'2.5 miles North of SR-706' (1) ·
'At Exit 76 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Over Fellsmere Canal ' (1) ·
'SR-704 Over SR-91 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1) ·
Over Fellsmere Canal (1) ·
SR-520 - Banana River (1) ·
US-192 EB-St Johns Relief (1)
26383999 (1) ·
26412600 (1) ·
26422701 (1) ·
26422817 (1) ·
26423954 (1) ·
26465960 (1) ·
26483165 (1) ·
26490300 (1) ·
26571634 (1) ·
26581961 (1) ·
26582109 (1) ·
27120310 (1) ·
27153115 (1) ·
27382038 (1) ·
27451178 (1) ·
27452951 (1) ·
27493308 (1) ·
27493323 (1) ·
28052963 (1) ·
28155940 (1) ·
28160000 (1) ·
28212829 (1) ·
28242068 (1) ·
29030413 (1)
80032221 (1) ·
80040125 (1) ·
80045519 (1) ·
80055370 (1) ·
80055680 (1) ·
80081956 (1) ·
80082635 (1) ·
80083008 (1) ·
80095468 (1) ·
80103697 (1) ·
80104046 (1) ·
80172570 (1) ·
80174285 (1) ·
80251396 (1) ·
80254429 (1) ·
80310299 (1) ·
80332834 (1) ·
80332921 (1) ·
80365438 (1) ·
80413919 (1) ·
80434440 (1) ·
80434460 (1) ·
80454978 (1) ·
80573537 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
12424 (1) ·
131860 (1) ·
1390 (1) ·
19606 (1) ·
198658 (1) ·
20993 (1) ·
23076 (1) ·
278468 (1) ·
3145 (1) ·
369555 (1) ·
37098 (1) ·
39038 (1) ·
39905 (1) ·
45978 (1) ·
56821 (1) ·
70268 (1) ·
75473 (1) ·
7634 (1) ·
8415 (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)