Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'C-24 CANAL ' (1) ·
'Cypress Creek ' (1) ·
'F.E.C. Railroad ' (1) ·
'HOWARD CREEK ' (1) ·
'Indian River Relief ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Tillman Canal ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CARLTON RD (CR613)' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Minton Road CR-509' (1) ·
'MURPHY RD ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-415 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR510 Wabasso Road' (1) ·
'SR70 EB Okeechobee' (1) ·
'SR70 WB Okeechobee' (1) ·
'WESTMORELAND BLVD ' (1)
704075 (1) ·
704150 (1) ·
704151 (1) ·
790035 (1) ·
880052 (1) ·
890115 (1) ·
890116 (1) ·
894003 (1) ·
930187 (1) ·
930198 (1) ·
930267 (1) ·
930268 (1) ·
930373 (1) ·
940019 (1) ·
940136 (1) ·
940157 (1) ·
945250 (1)
'.75 miles South of SR-882' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'SR-415 - Lake Ashby Canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)