Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Avenue ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-24 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'CROOKED CREEK ' (1) ·
'FECRR ' (1) ·
'L-10 Canal ' (1) ·
'Little Haw Creek ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'Middle Haw Creek ' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-518 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'Summit Boulevard ' (1) ·
Wickham Road (1)
'CR603(JOHNSTON RD)' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SEACREST BLVD. ' (1) ·
'SHINN ROAD ' (1) ·
'SR-40 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'ST LUCIE BLVD ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'US-1 NB ' (1) ·
I-95 (1)
700059 (1) ·
700122 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
700941 (1) ·
790018 (1) ·
790087 (1) ·
790920 (1) ·
890015 (1) ·
890117 (1) ·
890118 (1) ·
894014 (1) ·
930291 (1) ·
930292 (1) ·
930450 (1) ·
930479 (1) ·
930805 (1) ·
934142 (1) ·
934499 (1) ·
934731 (1) ·
940018 (1) ·
940026 (1) ·
940041 (1) ·
940071 (1)
'0.4MI NE OF A1A ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'3MI S of SR-70 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'NB I-95 over CR 708 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'US-1 NB - FECRR ' (1) ·
I-95 over Wickham Road (1)
26222805 (1) ·
26322120 (1) ·
26395750 (1) ·
26404575 (1) ·
26411700 (1) ·
26484825 (1) ·
26561373 (1) ·
27020590 (1) ·
27023771 (1) ·
27023967 (1) ·
27091468 (1) ·
27122264 (1) ·
27201709 (1) ·
27281147 (1) ·
27281239 (1) ·
28071404 (1) ·
28134900 (1) ·
28365858 (1) ·
28365910 (1) ·
28395825 (1) ·
28493662 (1) ·
29133602 (1) ·
29143956 (1)
80035203 (1) ·
80041480 (1) ·
80041600 (1) ·
80042465 (1) ·
80101517 (1) ·
80103468 (1) ·
80110316 (1) ·
80120030 (1) ·
80140214 (1) ·
80140445 (1) ·
80232703 (1) ·
80241142 (1) ·
80251175 (1) ·
80282441 (1) ·
80285306 (1) ·
80334956 (1) ·
80422093 (1) ·
80422195 (1) ·
80430700 (1) ·
80510378 (1) ·
80510486 (1) ·
80511328 (1) ·
80521049 (1) ·
81133337 (1) ·
81183972 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)