Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'Belvedere Road ' (1) ·
'C-37 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'C-52 Canal ' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'CANAL-17 ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'LEVEE NO.8 ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Padgett Branch Marsh ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'WPB CANAL C-51 ' (1)
'Americana Blvd. ' (1) ·
'Becker Rd. ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'JOG ROAD ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'KIRK ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'Old Dixie Highway ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 86.85 ' (1)
705918 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
880098 (1) ·
880099 (1) ·
890001 (1) ·
890021 (1) ·
890159 (1) ·
930142 (1) ·
930265 (1) ·
930359 (1) ·
930407 (1) ·
930431 (1) ·
930486 (1) ·
934293 (1) ·
934297 (1) ·
934751 (1) ·
941001 (1) ·
944014 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'100 ft E of Minton Road ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
26313548 (1) ·
26403700 (1) ·
26405713 (1) ·
26410722 (1) ·
26412597 (1) ·
26420393 (1) ·
26423954 (1) ·
26490300 (1) ·
26502106 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27123412 (1) ·
27281131 (1) ·
27333350 (1) ·
27333415 (1) ·
27382573 (1) ·
27382633 (1) ·
27395790 (1) ·
27395850 (1) ·
28003971 (1)
80035976 (1) ·
80045519 (1) ·
80061380 (1) ·
80070222 (1) ·
80070240 (1) ·
80074689 (1) ·
80081956 (1) ·
80085094 (1) ·
80102271 (1) ·
80172828 (1) ·
80181600 (1) ·
80200100 (1) ·
80214953 (1) ·
80225738 (1) ·
80401747 (1) ·
80403783 (1) ·
80403784 (1) ·
80434234 (1) ·
80434242 (1) ·
80475710 (1) ·
80475780 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)