Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Avenue ' (1) ·
'C-24 CANAL ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'Earman River (C-17) ' (1) ·
'FECRR ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Indian River Relief ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'West Palm Beach Canal ' (1) ·
Wickham Road (1)
'I 95 to PBIA Ramp ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'NW 5TH STREET ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'Service Road ' (1) ·
'SHINN ROAD ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
'US-98 SR700 US441 ' (1) ·
I-95 (1)
700059 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
704048 (1) ·
790087 (1) ·
890117 (1) ·
890118 (1) ·
930003 (1) ·
930030 (1) ·
930409 (1) ·
930410 (1) ·
930416 (1) ·
930450 (1) ·
930465 (1) ·
930479 (1) ·
931001 (1) ·
940018 (1) ·
940026 (1)
'0.2 mile East of US-1 ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'3MI S of SR-70 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'Just North of SR-850 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-700 CANAL POINT ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'US-1 NB - FECRR ' (1) ·
I-95 over Wickham Road (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)