Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'LAKE OSBOURNE ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'SR-421 ' (1) ·
'St Johns River Relief ' (1) ·
'W. Relief Indian River ' (1)
'CORKSCREW BLVD. ' (1) ·
'CR 880 ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 NB ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'NW 27TH AVE. ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-46 ' (1) ·
'SR-80 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SW 23RD AVE. ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1)
790029 (1) ·
790229 (1) ·
880105 (1) ·
885810 (1) ·
890138 (1) ·
930029 (1) ·
930038 (1) ·
930188 (1) ·
930199 (1) ·
930273 (1) ·
930302 (1) ·
930432 (1) ·
930512 (1) ·
930513 (1) ·
934341 (1) ·
934342 (1) ·
934502 (1) ·
937367 (1)
'.2mi East of US-27 ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4Mi. North of SR-60 ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'Boca Raton ' (1) ·
'CR 880 AT SIX MILE BEND ' (1) ·
'I-95 NB over SR-421 ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)