Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 CANAL ' (1) ·
'C-37 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'Cabbage Slough ' (1) ·
'CANAL-17 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FECRR ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
Wickham Road (1)
'DUDA ROAD ' (1) ·
'E Gateway Blvd ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Jupiter Boulevard ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR-46 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 NB ' (1) ·
I-95 (1)
700059 (1) ·
700134 (1) ·
700222 (1) ·
700230 (1) ·
705923 (1) ·
790028 (1) ·
790087 (1) ·
890117 (1) ·
890118 (1) ·
930069 (1) ·
930142 (1) ·
930359 (1) ·
930433 (1) ·
930450 (1) ·
934213 (1) ·
934519 (1) ·
940018 (1) ·
940026 (1)
'0.7MI N of Northlake Blvd' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'3MI S of SR-70 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'US-1 NB - FECRR ' (1) ·
'WEST PALM BEACH INTERCH. ' (1) ·
I-95 over Wickham Road (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)