Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-37 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'Cabbage Slough ' (1) ·
'CSX RR ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'St Johns River ' (1) ·
'St. Johns River ' (1)
'DUDA ROAD ' (1) ·
'E Gateway Blvd ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Jupiter Boulevard ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-46 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR806 Atlantic Ave' (1) ·
'WB SR706 to SB I95' (1)
700200 (1) ·
700217 (1) ·
705923 (1) ·
790028 (1) ·
790042 (1) ·
790100 (1) ·
930069 (1) ·
930384 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930433 (1) ·
934213 (1) ·
934519 (1)
'0.3 mile South of SR 706 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'Just W. of Congress Ave.' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-520 WB -St Johns River' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.